Sunday, January 7, 2018

How many application installed on Linux

Identify all Linux codes that accessible from terminal



https://www.youtube.com/watch?v=p6VGmXlTEYs

Resetting the root password Kali Linux

How To Change Login Password Kali Linux 

https://www.youtube.com/watch?v=CLp8hHSmZHk

Adding a non root user kali linux

How to add non-root user for Kali Linux



https://www.youtube.com/watch?v=V6mRcMGqMnI

Be Anonymous Hide Your Internet Activities (IP) with Tor and privoxy

Activate Tore and Privoxy 


https://www.youtube.com/watch?v=AbH4P2Jh3Ao

Getharing All Emails and Names Kali linux

How to Find Victim emails And Names 



https://www.youtube.com/watch?v=jdvU5sGsYMM

Hide Your Activity activate SSH Kali Linux

How To activate SSH 

Why SSH :- To minimize detection to victim when testing


https://www.youtube.com/watch?v=QrmNFXmb25w

Hack anyone password Using cupp method

How to Create 100% accurate password Dictionary



https://www.youtube.com/watch?v=F-MD4A9cTSY

How to Change Kali Linux Terminal Background and Font

Changing Terminal Background 


https://www.youtube.com/watch?v=bYw3QrO6uYY

Wednesday, December 27, 2017

Scaffolding

Introduction


Scaffolding is a temporary frame. Usually constructed from steel or aluminium alloy tubes or coupled to provide of access of high level working areas as well as providing a safe platform which to work.  
In the construction of building the wall may be raised to a height of 3000mm or more than as the building develops in the upward direction. Working platform must be provided which could be extended stage by stage to enable the craft man to reach their work with easy & to provide the means of conveying their materials. These platforms are called Scaffolding. 
Scaffolding should be stocked in a safe, easily accessible place. Also Clamps, form ties...etc smaller items should be kept in the stores. In our site the main site store is responsible for the scaffolding material. Rigger are the persons who erect and dismantle the scaffolding for the site requirements.  
In our site we have special trained people for assembling and dismantling the scaffolding system. If we need the scaffolding for work we should inform them early, then they will arrange the scaffolding as perfectly and we should approved that with help of safety officer after this procedure we let the workers for use that scaffolding. 

Basic requirements of scaffolding 

 The Scaffold platform should be such materials as to be storing enough to take the weight of the workman & the material that are to be used for construction.  
 Materials should not fall from the working platform. 
 The scaffold members should be kept in correct positions. 
 It should not bend or more in any direction. 
 The Scaffold should be provided along the standards to prevent workmen slipping off or any material or tools falling down a guardrail should also be provided at about 750 – 950mm above the platform as an additional support to the workmen. 
 When it’s impartible to follow the legal requirements for Scaffolding, safety nets should be used. 
  

Components of a Typical Scaffolding System 




Scaffolding frame                   Bracing     Staircase ladder 
Joint pin for pipe                     Joint pin for frame    Arm lock  
Clamp (fix & free)                  Pipe support     Safety chain 
Catwalk panel                         Cross Brace     Turn buckle  
G.I. pipes                                Caster wheel (small & large)  Extension 
Safety net                                Jack base (flat & u type)   Steel folding ladder 

Saturday, December 23, 2017

Construction Site Safety

Introduction of safety


The aim of monitoring safety on site is to avoid injuries arising from construction activities. Generally many companies have prepared the Safety Plan. This will be implemented in order to protect all personnel at site minimize the risk of accidents and incidents that could result in injury. In terms of our Safety Plan, it needs all levels of implementation and co-ordination in order to militate against risk and assure that adequate standards safety is maintained throughout the duration of the project. It will be a priority in all daily activities, undertakings and endeavors to ensure the safety of workers, the public and other persons directly or indirectly associated in this project. This safety measures will be continuously implemented throughout the duration of the project.

Responsibility of the officers about safety

Project Manager:

Overall responsibility for all health and safety matters on site.
Implement the safety Management system.
Ensure that all line management is conversant with the relevant requirements of current legislation and of the Safety Plan and that all managers are assigned duties and responsibilities to assist in its effective implementation.
Appoint a Safety Officer who shall be responsible to him.                

Safety Officer:

Ensure the safety plan is being correctly managed by Site Management and Subcontractors.
To write a maintain reports on-site inspections, audits and accident investigation.
To develop and maintain site safety training program.
To carry out regular liaison with Clients and Sub-contractors on safety matters.
To advise a promote safety and health on site by various means and in consultation with the Site Management.
Shall where necessary on behalf of the Project Manager to stop works, which he considers to be creating a hazard and risk.
To organize the safety proposals.
To keep records on safety CV of Safety Officer attached for review.

Higher management, Adm. Officer, Engineers:

Support to the Safety Officer and responsible for organizing works at site incompliance to the required safety standard.

All Personnel:
Shall take reasonable care on their own safety as well as that of others who may be affected by their actions or objectives at work.
Required to corporate with the management to achieve safety standard.
Encourage to proposed suggestions to improve health and safety at site to their immediate supervisor or Engineer or the Safety Officer.



Safe working procedures

Safety working procedures are written to ensure that site activities are properly controlled and executed safety and without risk to health.
The safe working procedures, which may be incorporated method statements shall be prepared and submitted for approval prior to commencement of activity.
All safety working procedures shall be clearly identified the objectives, the sequence of operations the foreseeable hazards and risks and the precautionary and protective measures required and be easily understood by the personnel who are to carry out the work. Procedures are to be included the control measures to reduce risks identified and methods of monitoring to ensure the control measures to reduce the risks identified, methods of monitoring to ensure the controls are applied.

Permission to Work

Where permits to work are required for specific operations such as entry into confined spaces, work in explosive of flammable atmosphere and special lifting operations shall be obtained approval by the Project Manager or persons authorized by him.
The Site Manager shall ensure that the issue of permits to work, and the work conducted under them is strictly controlled. Only competent person will authorize such permits

Safety equipment



Helmet
All workers/staff shall wear helmet at site.
Shoes
Bare foot, Sandals and slippers are prohibited at site.
Other Protective Wear
Safety belt shall be worn for following works
Structural steel erection, scaffolding erection, etc. at high place
Goggles shall be worn for following works
Chipping, Grinding, etc. in case small particles could be emitted.
Welding hoods shall be worn for following works
Welding, etc. in case harmful ray could be emitted.
Mask shall be worn for following works
Grinding/cutting concrete, etc. in case small particles could be emitted.

Prevention of Accidents Due to fall

In case of workers at heights safe scaffolding/platform shall be provided.
In case it is physically difficult to provide safe scaffolding/ plat form for works at heights, workers must use safety belt.
Opening which may cause fall shall be closed, or barrier.
Work at heights in strong wind and heavy rain is prohibited.
In case height /depth of working platform is more than 1 .5m, safe.
Facilities for going up and down shall be provided.
Prevention of Fire
Burning surplus materials within the site is prohibited.
Fire extinguishers shall be provided at appropriate interval with indication by signboard.
Contact Tel. No of nearest fire station shall be displayed at site & security office.
Flammable gas cylinder shall be kept at well-ventilated place.

First Aid


A first aid base shall be provided at our Site Office. An adequate number of first aid boxes shall be provided at various work locations.
Contact Tel. No .for calling safety officer shall be displayed at site office.
The first aid base shall be attended with a qualified first aid staff. The first aid base shall be for the use of Contractor’s all personnel employed, Engineer staff and Employer Contractors that needs immediate first aid treatment and other personnel directly or indirectly concerned with the project that requires first aid treatment.

Safety Signs




Safety Sign boards are demonstrate at site and some pictures are attached.
Following signs shall be provided at appropriate places according to the site situation/ progress.

Safety first                         No smoking

Wear Helmet                     Smoking area

Watch your head               Fire extinguisher

Safety access                     Dustbin

Other signs as required



Friday, December 22, 2017

Cartesian coordinate system

How to find distance between two points

Let’s Consider A, B two point and their coordinate respectively (x1, y1) ,(x2, y2)



 ALMN   
AN = LM=|OM-OL|=| x2 - x1|
          BN = |BM-NM| =|BM-AL|=| y2 - y1|

ANB 
From Pythagoras thermo;
    

So using above equation can find distant between two points
Example
If A (5, 2) ,B (1,-1) then find distance between AB 

Thursday, December 21, 2017

Metric Conversion

Metric Conversion Table


Length                    1 in. =25.44mm [approximately 25mm]
                                1ft = 304.8 mm [approximately 300mm]
                                1 yd  = 0.914m [approximately 910mm]
                                1 mile=1.609 km [approximately 1.1 yd.]
                                1km = 0.621 mile

Area                        1ft^2 =0.093 m^2
                                1 yd^2=0.836 m^2
                                1 acre = 0.405 ha [ 1 ha = 10000 m^2] { ha = hectare}
                                1 mile^2= 2.590 〖km〗^2
                                1m^2 = 10.764 〖ft〗^2 = 1.196yd^2
                                1ha = 2.471 acres
                                1km^2 =0.386〖mile〗^2

Volume                    1 ft^3=0.028m^3
                                1 yd^3 = 0.756m^3
                                1m^3 = 35.315ft^3=1.308yd^3
                                1ft^3=28.32 liters(1000 liters=1m^3)
                                1 gal= 4.546 liters
                                1 liter = 0.220 gal

Mass                        1 lb = 0.454kg
                                1 cwt = 50.80 kg
                                1 ton = 1.016 t ( 1 tone = 1000 kg = 0.984 ton)
                                1 kg = 2.205 lb

Density                    1lb/ft^3=16.019kg/m^3
                                1 kg/m^3=0.062 lb/〖ft〗^3

Velocity                   1ft/s = 0.305 m/s
                                1 mile/h = 1.609 km/h

Energy                     1 therm = 105.506 MJ
                                1 Btu = 1.055kJ

Thermal                   1 btu/ft^2h˚F = 5.678 W/m^2˚C
Conductivity 

Temperature             x˚F = (5/9)(x-32) ˚C
                                 x˚C =(9/5)x+32˚F
                                 0˚C=32˚F
                                

Hacking the Hacker Learn from the Experts Who Take Down Hackers



By Roger A. Grimes

Credits 
Project Editor Kelly Talbot 
Production Editor Barath Kumar Rajasekaran 
Copy Editor Kelly Talbot 
Production Manager Kathleen Wisor 
Manager of Content Development & Assembly Mary Beth Wakefield 
Marketing Manager Carrie Sherrill 
Professional Technology  & Strategy Director Barry Pruett
Business Manager Amy Knies
Executive Editor Jim Minatel
Project Coordinator, Cover Brent Savage Proofreader Nancy Bell 
Indexer Johnna VanHoose Dinse 
Cover Designer Wiley 
Cover Image ©CTRd/Getty Images

The intent of this book is to celebrate the world of computer security defend- ers by profiling some of the world’s best white-hat hackers, defenders,  privacy protectors, teachers, and writers. It’s my hope that you’ll walk away with a greater appreciation of the behind-the-scene efforts it took to give us the fantastic world of computers we live in today. Without all the good people on our side fighting against those who would do us harm, computers, the Internet, and everything connected to them would not be possible. This book is a celebration of the defenders.

Click below link to get book:-

Wednesday, December 20, 2017

How to get more then 50 views within 5 minutes for your blog post

Types Of Aggregate

Their four main types of aggregate available :-

1.) Heavy weight Aggregate 
2.) Normal Aggregate 
3.) Light weight Aggregate
4.) Special aggregate

1.) Heavy weight Aggregate :-


     -Density is very high occupier with normal aggregate ( 4000 to 8500 kg/m3 )

USAGE
    -It is giving necessary protection against ex-rays, gamma rays neutron and weight footing sub-mage pipe line etc..
    - It is frequently difficult with heavy weight aggregate to obtained a mixed which is both workable and pron to sagrigation 

4.) Special aggregate


Environmental consideration increasingly effecting the supply of aggregate their are strong objection opening of pits as well as Cory's
- as a same time their are problems with this goes a lot construction demolition rate and dumping of domestic waist 
their for both types of waist can be processed in to aggregates for using concrete and this is increasingly being done in number of waist countries
-recycle aggregate are expected to using future.     

TECHNICAL REPORT ON MECHANICAL ENGINEERING 03

vocational training report on mechanical engineering 


REPORT ON TRAINING 

On completion of each period of training , the trainee should prepare a report on his/her training which should be submitted to the training evaluation panel.

Example training report For :-
NV Q , IV Q students 
mechanicalr03.pdf

mr.robot mass entry to Ecorp

How to store aggregate properly

Storage of Aggregate


    •          Aggregate should be stored saw that its self-draining and saw that  it doesn’t become contaminated with other materials
    •           If a clean hard base stock of pile are not immediately available then the layer of  less concrete should be placed in order to take water away from the stock pile
    •           Water away from the stock pile
    •           It should be away from the mixture
    •            It should be as longer as possible as this helps to ensure uniformity of moisture content
    •           Delivery should be allow to standing the stock piles for 12hr before use
    •           Avoid the aggregate in the lower part of the stock pile. sins dirt and water from the higher layers can accumulate there
    •             When its store different size partials should be stored separately  


How many application installed on Linux

Identify all Linux codes that accessible from terminal https://www.youtube.com/watch?v=p6VGmXlTEYs